Skip to content
Georgetown Handyman Pros

Cabinet Installation in Georgetown, TX

Kitchen, laundry, garage, and built-in cabinets hung level and screwed into studs — from a single wall cabinet to a full wall assembled from flat-pack boxes.

Call (737) 215-4114 Book Online

Typical range: $150–$1,300 · Free written estimate first

Cabinet Installation in Georgetown, TX

New cabinets change a room more than almost anything else you can buy. They also punish a sloppy install. Hang one box a quarter inch off, and every cabinet after it follows the mistake. Doors stop lining up. Gaps open at the ceiling. Drawers rub. And a wall cabinet that’s held up by drywall anchors instead of studs is a cabinet waiting to come down with your dishes inside it.

We hang cabinets the slow-in-the-right-places way: level line first, every screw in a stud, doors adjusted until the gaps are even. Kitchen uppers, laundry room storage, garage cabinets, and full built-in walls — assembled from flat-pack boxes or straight out of the store, installed so they look like they came with the house.

Finished built-in cabinet wall with glass-front uppers and a desk counter in Georgetown, TX

What We Install

  • Kitchen cabinets — wall and base cabinets, extra uppers, pantry towers, and IKEA SEKTION kitchens on the suspension rail
  • Laundry room cabinets — uppers over the washer and dryer, so the detergent finally has a home that isn’t the top of the machine
  • Built-in walls — home office, dining room, and entertainment walls built from cabinet boxes, with a desk or serving counter on top
  • Garage cabinets — wall-hung storage that gets tools and paint cans off the floor
  • Bathroom storage — wall cabinets, over-the-toilet units, and like-for-like vanity swaps
  • Ready-to-assemble (RTA) cabinets — from IKEA, Home Depot, Lowe’s, Wayfair, Amazon, and online cabinet stores, assembled on site

New construction or a refresh of what you already have — if it’s a cabinet box going onto a wall or a floor, we install it.

How We Hang Cabinets So They Stay Put

Most bad cabinet jobs go wrong in the first ten minutes, before a single box is on the wall. Here’s how we do it instead:

  1. Find the high spot. Floors are rarely flat. We find the highest point along the run and set every height from there. Otherwise the base cabinets rock and the countertop won’t sit flat.
  2. Snap a level line. One line for the bottom of the uppers, carried across the whole wall.
  3. Mark every stud. Studs are usually 16 inches apart, but not always. We find each one, because that’s where the screws go.
  4. Hang a ledger or rail. A level board or the IKEA steel rail is screwed into the studs first. The cabinets sit on it while we fasten them, so nothing slips out of line.
  5. Clamp, then screw. Neighboring cabinets get clamped flush at the face and screwed to each other. Then each one is screwed through its back rail into the studs.
  6. Shim and scribe. Gaps behind the cabinets get shimmed so the boxes don’t twist when they’re tightened. Where a wall bows, filler strips are trimmed to fit it.
  7. Adjust every door. Modern hinges adjust three ways. We go door by door until the gaps are even and every door closes flush.
Level ledger board fastened to a laundry room wall before hanging cabinets in Georgetown, TX

That board across the wall in the photo above is the ledger. It’s screwed into the studs on a level line, the cabinets rest on it while they’re fastened, and it comes down when the run is finished. Below is the same wall with the run finished.

Gray wall cabinets installed above a laundry room counter in Georgetown, TX

Georgetown Homes and Their Walls

Every part of Georgetown has its own cabinet story.

In Sun City, a lot of homes are 20 or more years old, and owners are refreshing laundry rooms and garages rather than gutting kitchens. Adding uppers over the washer and dryer or a wall of garage cabinets is one of the most useful upgrades you can make, and it’s a one-day job, not a remodel.

In the newer subdivisions off Ronald Reagan and out toward SH-130, builder-grade laundry rooms often come with a single wire shelf and nothing else. Real cabinets in that space are a big step up, and the walls are usually straight and the studs easy to find.

Near the Historic Square and in the older neighborhoods around it, walls and floors are rarely perfectly plumb or level. That’s normal for an older house, and it’s exactly where shims, scribed filler strips, and patience make the difference between cabinets that look built-in and cabinets that look like they were added later.

Garage cabinets get extra thought here. A Texas garage in August is hot and often humid, and bare particleboard can swell over time when it soaks up moisture. We’ll point out which boxes hold up best in a garage and hang them off the slab, so mopping or a little water on the floor can’t reach the bottom edge.

Flat-Pack Built-Ins: Assembly and Installation in One Trip

Some of our favorite jobs start as a stack of flat boxes. The dining room wall at the top of this page started that way: a pile of cabinet frames, glass-front uppers, a run of drawers, and a desk counter, all assembled on site and then installed as one built-in wall.

Flat-pack cabinet boxes being assembled for a built-in wall in Georgetown, TX

Doing both halves in one visit saves you the hardest part. Assembly is where parts go missing and boxes get built slightly out of square. Installation is where that out-of-square box shows up as a door that won’t line up. When the same person builds and hangs the cabinets, problems get caught on the floor, not on the wall. If you’re only putting together freestanding pieces, our furniture assembly page covers that.

Where We Stop

We’d rather tell you up front than surprise you halfway through:

  • Stone countertops — granite and quartz are templated and installed by the fabricator after the base cabinets are in. We set laminate and butcher-block tops ourselves.
  • Moving plumbing — we reconnect an existing sink and faucet on a like-for-like swap (see faucet & fixture replacement), but relocating water or drain lines needs a licensed plumber.
  • New electrical — hardwired under-cabinet lighting or a new outlet needs a licensed electrician. Plug-in and battery lights we can install.
  • Full kitchen remodels — tearing out walls, moving the layout, or new flooring is a general contractor’s job.

Cabinet Installation Cost in Georgetown

Pricing is simple, and you get the number before we start:

  • One or two wall cabinets: usually covered by the $150 service call, which includes the first hour of work.
  • A laundry room or garage run of uppers: typically a half day — $350.
  • A full built-in wall or small kitchen run from flat-pack boxes: usually one to two full days — $650–$1,300.

Screws, shims, and filler strips are added at cost with the receipt shown. Send a few photos of the space and the cabinet brand or model, and we’ll come back with one flat price in writing. Want to pick a time now? Book online and choose your day.

New cabinets sitting in boxes? Call for a free estimate and we’ll get them on the wall — level, solid, and done right.

Cabinet Installation — free estimate for Georgetown

Talk to the person who'll actually do the work — not a call center. Free estimates for Georgetown and surrounding areas.

Cabinet Installation — Common Questions

+ How much does cabinet installation cost in Georgetown?

It depends on how many boxes and whether they come assembled. Hanging one or two wall cabinets usually fits inside our $150 service call, which covers the first hour. A run of laundry room uppers is typically a half day — $350. A full built-in wall or a small kitchen run built from flat-pack boxes is usually one to two full days, $650–$1,300. Send photos and the cabinet brand or model, and you get one flat price in writing before we start.

+ Do you install IKEA kitchen cabinets?

Yes. IKEA's SEKTION wall cabinets hang on a steel suspension rail, and getting that rail dead level and screwed into every stud is what makes the whole run line up. We assemble the boxes, hang the rail, set the cabinets, and adjust every door and drawer front so the gaps are even.

+ Can you install cabinets I bought from Home Depot, Lowe's, or online?

Yes — pre-assembled stock cabinets and ready-to-assemble (RTA) boxes from any store or website. Have them delivered and leave them in the boxes until we get there, so we can check for shipping damage and missing parts before anything goes on the wall.

+ Do you handle countertops, plumbing, and electrical too?

Some of it. We set laminate and butcher-block tops on cabinets we install. Granite and quartz are measured and installed by the stone fabricator — that's their job, not ours. On a sink base we disconnect and reconnect the existing faucet and drain. Moving water lines or adding a hardwired circuit for under-cabinet lights needs a licensed plumber or electrician, and we'll tell you straight when you need one. Plug-in and battery under-cabinet lights we can put in.

+ How do you make sure heavy cabinets stay on the wall?

Every wall cabinet is screwed through its back rail into wall studs with cabinet screws — never just drywall anchors. We set a level line, hang the run on a ledger board or rail so nothing sags while we work, and clamp neighboring cabinets together before screwing them to each other. A loaded upper cabinet full of dishes is heavy, and it should never move.

+ How long does a cabinet install take?

A single cabinet takes an hour or two. A laundry room or garage run of uppers is usually a half day. A full built-in wall or a kitchen run assembled from flat-pack boxes is usually one to two days. We'll tell you the time up front so you can plan around it.

(737) 215-4114

Free Estimates • Upfront Flat-Rate Pricing • Georgetown, TX